PT . SULZER HICKAM INDONESIA
REPAIR AND OVERHAUL OF FUJI ELECTRIC 137.5 MVA TURBINE UNIT #1 WAYANG WINDU - POWER PLANT
GENERAL SCOPE OF WORK
1. Pre-Inspection before shut down
2. Dismantle unit of Generator
3. Pull out main rotor from stator
4. Electrical and Mechanical Inspection
5. Clean and Inspec all generator components
6. Electrical test of stator, rotor winding & exciter
7. Inserting Rotor to Stator
8. Completed re-assembly generator
9. Laser alignment generator with turbine
10. Compromising test and completion all reported