PT . BOC GRESIK POWER INDONESIA

REWINDING 3 (THREE) UNITS OF IDEAL ELECTRIC 10 MW MAIN ROTOR GENERATOR

GENERAL SCOPE OF WORK
1. Main rotor generator as received inspection
2. Mechanical and electrical inspection
3. Take data original rotor poles winding
4. Stripping all rotor poles winding and cleaning
5. Manufacture special tool for re-winding
6. Preparation tool and equipment for rewinding
7. Re-wiinding main rotor poles
8. Electrical test rotor poles during & after rewinding 
9. Final dynamic balance rotor
10. Commisioning test and completion all reprted