01

REWINDING 5.7 MW BRUSH AC MOTOR

Serviced at our workshop

  • Incoming inspection and electrical testing

  • Coil removal

  • Cleaning of stator core

  • Rewedges

  • Coil insertion

  • Surge testing

  • Connection

  • Application of dry air varnish coating (red oxide)

  • Vacuum Pressure Impregnation (VPI)

  • Baking

  • Final testing

02

REWINDING 10 MW IDEAL GENERATOR

Serviced at our workshop

  • Mobilisation of tools and equipment

  • Deployment of technicians

  • Implementation of Lockout Tagout (LOTO) procedures

  • Preliminary inspection and documentation of existing conditions

  • Rotor extraction

  • Mechanical inspection and air cooling system cleaning

  • Electrical testing post-cleaning

  • Tan Delta test and offline Partial Discharge (PD) test

  • Application of dry air varnish coating (red oxide)

03

OVERHAUL 21300 KVA GE GENERATOR

Serviced onsite

  • Mobilisation of tools, equipment and personnel

  • Implementation of Lockout Tagout (LOTO) procedures

  • Preliminary inspection and documentation of existing conditions

  • Rotor extraction

  • Mechanical inspection and air cooling system cleaning

  • Electrical testing post-cleaning

  • Tan Delta test and offline Partial Discharge (PD) test

  • Application of dry air varnish coating (red oxide)

  • Dismantling

  • Cleaning and baking

  • Electromagnetic Core Imperfection Detection (ELCID) test

  • Reassembly and commissioning

04

OVERHAUL 2950 KW TMEIC VERTICAL AC MOTOR

Serviced at our workshop

  • Incoming inspection and documentation of existing conditions

  • Preliminary electrical and mechanical testing

  • Rotor extraction

  • Dismantling

  • Mechanical inspection and cleaning

  • Cleaning and baking

  • Electrical testing post-cleaning

  • Replacement of bearings

  • Rotor balancing

  • Application of dry air varnish coating (red oxide)

  • Reassembly

  • Final testing

05

OVERHAUL 1650 KW ASI ROBICON ARMATURE

Serviced at our workshop

  • Implementation of Lockout Tagout (LOTO) procedures

  • Dismantling of generator components and rotor extraction

  • Coil removal

  • Rewinding of stator windings

  • Replacement of Resistance Temperature Detectors (RTDs)

  • Electrical testing after cleaning

  • Rotor dynamic balancing test

  • Replacement of bearings

  • Application of dry air varnish (red oxide)

  • Reassembly

06

OVERHAUL 11870 KW ABB GENERATOR

Serviced at our workshop

  • Mobilisation of personnel

  • Removal of compartment and heat insulation

  • Dismantling governor speed control system

  • Levelling and lifting rotor up

  • Removal of upper half and lower half labyrinth seals

  • Sandblasting rotor and diaphragm

  • Installing rotor

  • Installing Governor Valve (GV)

  • Final alignment

  • Safety device testing

  • Collection of alignment data

  • Levelling and rotor lifting

  • Emergency Stop Valve (ESV) installation

  • Commissioning

07

REFURBISHMENT 74 KV GRID BLOWER MOTOR

Serviced at our workshop

  • Record inspection

  • Dismantling

  • Coil removal from armature

  • Rewinding of the armature

  • Vacuum Pressure Impregnation (VPI) and baking

  • Rotor balancing

  • Reassembly

  • Final testing

08

Refurbishment of 7838 Elmagco Brake Motor

Serviced at our Workshop

  • Dismantle brake and remove magnet

  • Electrical and mechanical inspections

  • Clean magnet pole faces and rotor assembly

  • Sandblast brake magnets (DE/NDE), bearing housings (DE/NDE), brackets (DE/NDE), rotor drum and main housing/frame

  • Apply protective coating to all sandblasted areas, excluding magnet pole faces

  • Repair DE/NDE bearing housings by sleeving

  • Fit new DE/NDE bearings, grease sleeve seal and seals

  • Replace corroded bolts as required

  • Replace heat-shrink lead cable

  • Supply and install new plug, dowel pin, breather magnet and stopper coupling

  • Reassemble brake and measure and record air gaps

  • Painting

09

REWINDING 1250 KW SIEMENS STATOR WHEEL MOTOR

Serviced at our workshop

  • Coil removal

  • Electrical testing

  • Rewedges

  • Coil insertion

  • Surge testing

  • Connection

  • Application of dry air varnish coating (red oxide)

  • Performed Vacuum Pressure Impregnation (VPI)

  • Baking

  • Final testing

10

OVERHAUL 4100 KVA A VAIN KAICK GENERATOR

Serviced at our workshop

  • Rotor extraction

  • Initial electrical testing

  • Cleaning of stator and rotor windings

  • Replacement of bearings

  • Electrical testing post-cleaning

  • Reinstallation of rotor

  • Application of dry air varnish (red oxide)

  • Dismantling

  • Baking

  • Balancing

11

REPAIR 21588 KVA HITACHI ROTOR

Serviced at our workshop

  • Rotor inspection

  • Preliminary electrical and mechanical testing

  • Removal of retaining ring

  • Cleaning of retaining ring

  • Wedge and coil repair

  • Wedge installation

  • Balancing

  • Final testing

12

OVERHAUL 5000 KW AC INDUCTION MOTOR

Serviced Onsite

  • Mobilisation of tools, equipment and personnel

  • Implementation of Lockout Tagout (LOTO) procedures

  • Preliminary inspection and documentation of existing conditions

  • Rotor extraction

  • Dismantling

  • Mechanical inspection and air cooling system cleaning

  • Cleaning and baking

  • Electrical testing post-cleaning

  • Balancing

  • Reassembly

  • Application of dry air varnish coating (red oxide)

  • Reassembly and commissioning

13

OVERHAUL 6000 KW SHINKO STEAM TURBINE

Serviced onsite

  • Mobilisation of personnel

  • Removal of compartment and heat insulation

  • Dismantling governor speed control system

  • Levelling and lifting rotor up

  • Removal of upper half and lower half labyrinth seals

  • Installing rotor

  • Installing Governor Valve (GV)

  • Final alignment

  • Safety device test

14

Refurbishment General Electric DC Traction Motor

  • Dismantle

  • Steam-clean and bake

  • Electrical tests on windings

  • Mechanical inspection of motor components

  • Supply and install new lead cables and cable gland

  • Sandblast brush holders

  • Supply and install new spring kit assemblies and carbon brushes

  • Application of dry air varnish coating (red oxide)

  • Skim-cut the commutator and perform undercutting

  • Supply and install new bearings

  • Dynamic balancing and reassembly

  • Commissioning

  • Painting